The Jenkins Controller is preparing for shutdown. No new builds can be started.
Unstablelinux-x86_64 (Jun 27, 2014, 8:51:40 PM)
Started 11 yr ago
Took
46 min
on linux64-AMD58xx-debian7-jogamp-x64-sgothel-002
| Started by upstream project jogl build number 1286 originally caused by:
- Started by upstream project joal-demos build number 439
originally caused by:
- Started by upstream project joal build number 546
originally caused by:
- Started by upstream project gluegen build number 804
originally caused by:
|
| Revision: 0bded476868c5fdfe44502bfd55957469d0d72bb
Repository: git://jogamp.org/srv/scm/jogl.git
|
| Test Result (1 failure / -1) |
|
Changes
- Fix build if oculusvr-sdk submodule is missing
(details / cgit)
- GLU: Make ProjectFloat/ProjectDouble final and deprecate GLU.destroy()
(details / cgit)
- Enhance FloatUtil: Merge ProjectFloat features while adding optimized
(details / cgit)
|