Skip to content
The Jenkins Controller is preparing for shutdown. No new builds can be started.
Failed

Console Output

Started by upstream project "jogl_onmaster" build number 125
originally caused by:
 Started by upstream project "joal_onmaster" build number 115
 originally caused by:
  Started by upstream project "gluegen_onmaster" build number 99
  originally caused by:
   Started by user Sven Gothel
Running as SYSTEM
Building on the built-in node in workspace /srv/jenkins/jobs/jogl-demos_onmaster/workspace
The recommended git tool is: NONE
No credentials specified
 > git rev-parse --resolve-git-dir /srv/jenkins/jobs/jogl-demos_onmaster/workspace/.git # timeout=10
Fetching changes from the remote Git repository
 > git config remote.origin.url git://jogamp.org/srv/scm/jogl-demos.git # timeout=10
Fetching upstream changes from git://jogamp.org/srv/scm/jogl-demos.git
 > git --version # timeout=10
 > git --version # 'git version 2.30.2'
 > git fetch --tags --force --progress -- git://jogamp.org/srv/scm/jogl-demos.git +refs/heads/*:refs/remotes/origin/* # timeout=10
 > git rev-parse origin/master^{commit} # timeout=10
Checking out Revision 42ebc710aac9d4bce185ac3759ff07c6028bfcac (origin/master)
 > git config core.sparsecheckout # timeout=10
 > git checkout -f 42ebc710aac9d4bce185ac3759ff07c6028bfcac # timeout=10
Commit message: "Adapt to JOGL GLArrayData API Change commit 3d537d4239e3772ffdb33592e5e66844d94ac9f3"
 > git rev-list --no-walk 650296b9b5ea3c340cdb668decbdbe73821fd990 # timeout=10
No emails were triggered.
Triggering jogl-demos_onmaster » linux-x86_64-master-001
jogl-demos_onmaster » linux-x86_64-master-001 completed with result FAILURE
Email was triggered for: Failure - Any
Sending email for trigger: Failure - Any
Error evaluating token: Error processing tokens
Not sending mail to unregistered user sgothel@jausoft.com because your SCM claimed this was associated with a user ID ‘Sven Gothel' which your security realm does not recognize; you may need changes in your SCM plugin
Sending email to: chuckslave@jogamp.org
Project jogl-demos_onmaster still waiting for [jocl_onmaster] builds to complete
Notifying upstream projects of job completion
Notifying upstream of completion: jogl_onmaster #125
All downstream projects complete!
Minimum result threshold not met for join project
Finished: FAILURE